All airlines flying from Tucson (TUS) to Denver (DEN).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 05:45 Tucson (TUS) 08:35 Denver (DEN)
Southwest Airlines WN 126 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-08-09 through 2025-09-27
Sun 06:10 Tucson (TUS) 09:00 Denver (DEN)
Southwest Airlines WN 126 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-08-10 through 2025-08-24
Sun 06:10 Tucson (TUS) 09:00 Denver (DEN)
Southwest Airlines WN 126 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-09-07 through 2025-09-28
Sun 06:30 Tucson (TUS) 09:20 Denver (DEN)
Southwest Airlines WN 126 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-08-31
Tue,Wed 06:50 Tucson (TUS) 09:40 Denver (DEN)
Southwest Airlines WN 126 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-08-05 through 2025-10-01
Tue,Wed 05:25 Tucson (TUS) 07:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-04 through 2025-11-12
Mon-Thu 05:25 Tucson (TUS) 07:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-11-17 through 2025-11-20
Mon-Fri 05:25 Tucson (TUS) 07:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-02 through 2025-12-11
Mon-Wed 05:25 Tucson (TUS) 07:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-15 through 2025-12-17
Wed,Thu 05:25 Tucson (TUS) 07:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-12-24 through 2026-01-01
Sat 10:25 Tucson (TUS) 12:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-22 through 2025-11-29
Sat 10:25 Tucson (TUS) 12:15 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-20 through 2026-01-03
Mon,Thu,Fri,Sun 10:30 Tucson (TUS) 12:20 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 10:30 Tucson (TUS) 12:20 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-21 through 2025-11-28
Fri,Sun 10:30 Tucson (TUS) 12:20 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-07 through 2025-12-14
Thu 10:30 Tucson (TUS) 12:20 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2025-12-18
Mon 10:30 Tucson (TUS) 12:20 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Operates only on 2026-01-05
Mon-Wed 10:35 Tucson (TUS) 12:25 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 10:35 Tucson (TUS) 12:25 Denver (DEN)
Southwest Airlines WN 155 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-19 through 2026-01-04
Sat 10:20 Tucson (TUS) 13:20 Denver (DEN)
Southwest Airlines WN 280 Non-stop Boeing 737-700 (Scimitar Winglets) 2:00 Effective 2025-10-04 through 2025-11-01
Daily 06:00 Tucson (TUS) 08:55 Denver (DEN)
United Airlines UA 294 Non-stop Boeing 737-800 (738) 1:55 Effective 2025-08-19 through 2025-11-01
Daily 07:00 Tucson (TUS) 08:55 Denver (DEN)
United Airlines UA 294 Non-stop Boeing 737-800 (738) 1:55 Effective from 2025-11-02
Fri 09:40 Tucson (TUS) 12:35 Denver (DEN)
Southwest Airlines WN 352 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2025-07-04
Sat 09:20 Tucson (TUS) 12:15 Denver (DEN)
Southwest Airlines WN 411 Non-stop Boeing 737-700 (73W) 1:55 Valid until 2025-05-31
Sun 10:00 Tucson (TUS) 12:55 Denver (DEN)
Southwest Airlines WN 411 Non-stop Boeing 737-700 (73W) 1:55 Valid until 2025-05-18
Sun 10:00 Tucson (TUS) 12:55 Denver (DEN)
Southwest Airlines WN 411 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2025-06-01
Mon,Thu,Fri 10:05 Tucson (TUS) 13:00 Denver (DEN)
Southwest Airlines WN 411 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Valid until 2025-06-02
Tue,Wed 15:20 Tucson (TUS) 18:20 Denver (DEN)
Southwest Airlines WN 411 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Valid until 2025-06-04
Tue,Wed 10:40 Tucson (TUS) 12:30 Denver (DEN)
Southwest Airlines WN 503 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-04 through 2025-11-12
Mon-Thu 10:40 Tucson (TUS) 12:30 Denver (DEN)
Southwest Airlines WN 503 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-11-17 through 2025-11-20
Mon-Fri 10:40 Tucson (TUS) 12:30 Denver (DEN)
Southwest Airlines WN 503 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-02 through 2025-12-11
Mon-Wed 10:40 Tucson (TUS) 12:30 Denver (DEN)
Southwest Airlines WN 503 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-15 through 2025-12-17
Wed,Thu 10:40 Tucson (TUS) 12:30 Denver (DEN)
Southwest Airlines WN 503 Non-stop Boeing 737-700 (Scimitar Winglets) 1:50 Effective 2025-12-24 through 2026-01-01
Mon,Thu,Fri 05:50 Tucson (TUS) 08:40 Denver (DEN)
Southwest Airlines WN 536 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 05:50 Tucson (TUS) 08:40 Denver (DEN)
Southwest Airlines WN 536 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-07-07 through 2025-08-04
Fri 06:10 Tucson (TUS) 09:00 Denver (DEN)
Southwest Airlines WN 536 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-07-04
Tue,Wed 09:30 Tucson (TUS) 12:25 Denver (DEN)
Southwest Airlines WN 536 Non-stop Boeing 737-700 (73W) 1:55 Effective 2025-06-10 through 2025-07-30
Mon,Thu,Fri 05:40 Tucson (TUS) 08:30 Denver (DEN)
Southwest Airlines WN 538 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-08-07 through 2025-09-29
Tue,Wed 10:05 Tucson (TUS) 12:55 Denver (DEN)
Southwest Airlines WN 538 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-08-05 through 2025-10-01
Daily 13:30 Tucson (TUS) 16:27 Denver (DEN)
United Airlines UA 667 Non-stop Boeing 737 MAX 8 (7M8) 1:57 Effective 2025-09-25 through 2025-10-25
Daily 13:37 Tucson (TUS) 16:36 Denver (DEN)
United Airlines UA 667 Non-stop Boeing 737-800 (738) 1:59 Effective 2025-10-26 through 2025-11-01
Daily 13:42 Tucson (TUS) 16:38 Denver (DEN)
United Airlines UA 667 Non-stop Boeing 737-800 (738) 1:56 Effective 2025-08-19 through 2025-09-24
Daily 14:30 Tucson (TUS) 16:26 Denver (DEN)
United Airlines UA 667 Non-stop Boeing 737-800 (738) 1:56 Effective from 2025-11-02
Sun 10:10 Tucson (TUS) 13:05 Denver (DEN)
Southwest Airlines WN 668 Non-stop Boeing 737-800 (73H) 1:55 Effective 2025-06-08 through 2025-08-03
Daily 06:00 Tucson (TUS) 08:55 Denver (DEN)
United Airlines UA 700 Non-stop Boeing 737-800 (738) 1:55 Valid until 2025-05-21
Sun 11:30 Tucson (TUS) 14:20 Denver (DEN)
Southwest Airlines WN 746 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-08-31
Thu 12:15 Tucson (TUS) 14:10 Denver (DEN)
Southwest Airlines WN 910 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-11-27
Sat 06:00 Tucson (TUS) 08:50 Denver (DEN)
Southwest Airlines WN 1104 Non-stop Boeing 737-800 (73H) 1:50 Valid until 2025-05-31
Mon,Thu,Fri 06:25 Tucson (TUS) 09:15 Denver (DEN)
Southwest Airlines WN 1104 Non-stop Boeing 737-800 (73H) 1:50 Valid until 2025-06-02
Sun 06:30 Tucson (TUS) 09:20 Denver (DEN)
Southwest Airlines WN 1104 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2025-05-18
Ad flat here 8924483383 I FlightInfo Lower
Parallax here TUS-DEN
1 2 3 4 5 6   next


All airlines flying from Tucson (TUS) to Denver (DEN).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-08-09 through 2025-09-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-10-04 through 2025-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:00, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-08-19 through 2025-11-01
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:55, non-stop
Boeing 737-800 (738)

Effective from 2025-11-02
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:55, non-stop
Boeing 737-800 (738)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (Scimitar Winglets)

Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Effective 2025-09-25 through 2025-10-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:57, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-10-26 through 2025-11-01
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:59, non-stop
Boeing 737-800 (738)

Effective 2025-08-19 through 2025-09-24
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:56, non-stop
Boeing 737-800 (738)

Effective from 2025-11-02
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:56, non-stop
Boeing 737-800 (738)

Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Valid until 2025-05-21
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:55, non-stop
Boeing 737-800 (738)

Operates only on 2025-08-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-11-27
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here TUS-DEN
Page 1 / 6        next
  • A domestic route departing from the Tucson airport (TUS) and arriving at Denver airport (DEN).
  • The flight distance is 639 miles, or 1028 km.
  • The timezone of both the departure and the arrival airports is UTC-7 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:50 and 2:10.