All airlines flying from Memphis (MEM) to Orlando Sanford (SFB).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Fri 16:07 Memphis (MEM) 19:01 Orlando Sanford (SFB)
Allegiant Air G4 1218 Non-stop Boeing 737 MAX 8 (7M8) 1:54 Effective 2025-06-20 through 2025-06-27
Fri 14:24 Memphis (MEM) 17:13 Orlando Sanford (SFB)
Allegiant Air G4 1222 Non-stop Airbus A320 (320) 1:49 Operates only on 2025-10-03
Fri 08:09 Memphis (MEM) 11:02 Orlando Sanford (SFB)
Allegiant Air G4 1254 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-05-23
Fri 15:06 Memphis (MEM) 17:59 Orlando Sanford (SFB)
Allegiant Air G4 1254 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-05-30
Mon 15:47 Memphis (MEM) 18:36 Orlando Sanford (SFB)
Allegiant Air G4 1258 Non-stop Boeing 737 MAX 8 (7M8) 1:49 Operates only on 2025-10-27
Mon 15:47 Memphis (MEM) 18:36 Orlando Sanford (SFB)
Allegiant Air G4 1258 Non-stop Airbus A320 (320) 1:49 Operates only on 2025-11-03
Fri 18:37 Memphis (MEM) 21:26 Orlando Sanford (SFB)
Allegiant Air G4 1260 Non-stop Airbus A320 (320) 1:49 Effective 2025-10-24 through 2025-10-31
Fri 20:31 Memphis (MEM) 23:20 Orlando Sanford (SFB)
Allegiant Air G4 1272 Non-stop Boeing 737 MAX 8 (7M8) 1:49 Effective 2025-10-10 through 2025-10-17
Mon 08:09 Memphis (MEM) 11:02 Orlando Sanford (SFB)
Allegiant Air G4 1280 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-05-26
Mon 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 1313 Non-stop Boeing 737 MAX 8 (7M8) 1:56 Effective 2025-07-07 through 2025-07-21
Mon 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 1313 Non-stop Airbus A320 (320) 1:56 Operates only on 2025-07-28
Mon 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 1313 Non-stop Boeing 737 MAX 8 (7M8) 1:56 Operates only on 2025-08-04
Mon 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 1313 Non-stop Airbus A319 (319) 1:56 Operates only on 2025-08-11
Wed 14:51 Memphis (MEM) 17:47 Orlando Sanford (SFB)
Allegiant Air G4 1333 Non-stop Boeing 737 MAX 8 (7M8) 1:56 Effective 2025-07-02 through 2025-07-23
Mon 15:59 Memphis (MEM) 18:52 Orlando Sanford (SFB)
Allegiant Air G4 1343 Non-stop Airbus A320 (320) 1:53 Effective 2025-06-09 through 2025-06-16
Mon 15:06 Memphis (MEM) 17:59 Orlando Sanford (SFB)
Allegiant Air G4 2820 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-06-02
Fri 15:05 Memphis (MEM) 17:58 Orlando Sanford (SFB)
Allegiant Air G4 2821 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-08-15
Mon 14:33 Memphis (MEM) 17:26 Orlando Sanford (SFB)
Allegiant Air G4 2833 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-05-19
Mon,Fri 20:24 Memphis (MEM) 23:16 Orlando Sanford (SFB)
Allegiant Air G4 2833 Non-stop Boeing 737 MAX 8 (7M8) 1:52 Valid until 2025-05-12
Wed 08:20 Memphis (MEM) 11:14 Orlando Sanford (SFB)
Allegiant Air G4 2840 Non-stop Boeing 737 MAX 8 (7M8) 1:54 Effective 2025-06-04 through 2025-06-25
Fri 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 2846 Non-stop Boeing 737 MAX 8 (7M8) 1:56 Effective 2025-07-04 through 2025-08-01
Fri 16:04 Memphis (MEM) 19:00 Orlando Sanford (SFB)
Allegiant Air G4 2846 Non-stop Airbus A319 (319) 1:56 Operates only on 2025-08-08
Mon 18:46 Memphis (MEM) 21:35 Orlando Sanford (SFB)
Allegiant Air G4 2873 Non-stop Airbus A320 (320) 1:49 Effective 2025-11-10 through 2025-11-17
Mon 15:57 Memphis (MEM) 18:51 Orlando Sanford (SFB)
Allegiant Air G4 2890 Non-stop Boeing 737 MAX 8 (7M8) 1:54 Operates only on 2025-06-23
Mon 16:07 Memphis (MEM) 19:01 Orlando Sanford (SFB)
Allegiant Air G4 2890 Non-stop Boeing 737 MAX 8 (7M8) 1:54 Operates only on 2025-06-30
Fri 15:59 Memphis (MEM) 18:52 Orlando Sanford (SFB)
Allegiant Air G4 2891 Non-stop Airbus A320 (320) 1:53 Operates only on 2025-06-06
Fri 15:59 Memphis (MEM) 18:52 Orlando Sanford (SFB)
Allegiant Air G4 2891 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-06-13
Mon 15:39 Memphis (MEM) 18:28 Orlando Sanford (SFB)
Allegiant Air G4 2895 Non-stop Boeing 737 MAX 8 (7M8) 1:49 Operates only on 2025-10-06
Mon 15:39 Memphis (MEM) 18:28 Orlando Sanford (SFB)
Allegiant Air G4 2895 Non-stop Airbus A320 (320) 1:49 Operates only on 2025-10-13
Mon 15:39 Memphis (MEM) 18:28 Orlando Sanford (SFB)
Allegiant Air G4 2895 Non-stop Boeing 737 MAX 8 (7M8) 1:49 Operates only on 2025-10-20
Wed 08:12 Memphis (MEM) 11:05 Orlando Sanford (SFB)
Allegiant Air G4 2914 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Effective 2025-05-21 through 2025-05-28
Mon 15:05 Memphis (MEM) 17:58 Orlando Sanford (SFB)
Allegiant Air G4 2916 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-08-18
Fri 18:46 Memphis (MEM) 21:35 Orlando Sanford (SFB)
Allegiant Air G4 2957 Non-stop Airbus A320 (320) 1:49 Operates only on 2025-11-07
Fri 18:46 Memphis (MEM) 21:35 Orlando Sanford (SFB)
Allegiant Air G4 2957 Non-stop Boeing 737 MAX 8 (7M8) 1:49 Operates only on 2025-11-14
Fri 14:33 Memphis (MEM) 17:26 Orlando Sanford (SFB)
Allegiant Air G4 2961 Non-stop Boeing 737 MAX 8 (7M8) 1:53 Operates only on 2025-05-16
Ad flat here 8924483383 I FlightInfo Lower
Parallax here MEM-SFB


All airlines flying from Memphis (MEM) to Orlando Sanford (SFB).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2025-06-20 through 2025-06-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:54, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-10-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Operates only on 2025-05-23
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-05-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-10-27
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-11-03
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Effective 2025-10-24 through 2025-10-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Effective 2025-10-10 through 2025-10-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:49, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-05-26
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-07 through 2025-07-21
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:56, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-07-28
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:56, non-stop
Airbus A320 (320)

Operates only on 2025-08-04
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:56, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-11
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:56, non-stop
Airbus A319 (319)

Effective 2025-07-02 through 2025-07-23
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:56, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-09 through 2025-06-16
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Airbus A320 (320)

Operates only on 2025-06-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-05-19
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2025-05-12
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:52, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-06-04 through 2025-06-25
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:54, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-07-04 through 2025-08-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:56, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-08
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:56, non-stop
Airbus A319 (319)

Effective 2025-11-10 through 2025-11-17
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Operates only on 2025-06-23
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:54, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-06-30
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:54, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-06-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Airbus A320 (320)

Operates only on 2025-06-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-10-06
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-10-13
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Operates only on 2025-10-20
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:49, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-05-21 through 2025-05-28
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-08-18
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-11-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:49, non-stop
Airbus A320 (320)

Operates only on 2025-11-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:49, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-05-16
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:53, non-stop
Boeing 737 MAX 8 (7M8)
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here MEM-SFB
  • A domestic route departing from the Memphis airport (MEM) and arriving at Orlando Sanford airport (SFB).
  • The flight distance is 668 miles, or 1074 km.
  • The timezone of the departure airport is UTC-6 , and the timezone of the arrival airport is UTC-5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time varies between 1:49 and 1:56.