Southwest Airlines flight WN 3880: Multiple routes

Ad box here 1220564027 I FlightWNum Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon,Thu,Fri 14:45 Oakland (OAK) 2 16:15 San Diego (SAN) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-08-07 through 2025-09-29
Fri 15:00 Las Vegas Harry Reid (LAS) 1 21:55 John Glenn Columbus (CMH)
WN 3880 Non-stop Boeing 737-700 (73W) 3:55 Operates only on 2025-07-04
Tue,Wed 15:00 Oakland (OAK) 2 16:30 San Diego (SAN) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-08-05 through 2025-10-01
Tue,Wed 16:25 Oakland (OAK) 2 17:50 Long Beach (LGB)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-11-04 through 2025-11-12
Mon-Thu 16:25 Oakland (OAK) 2 17:50 Long Beach (LGB)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-11-17 through 2025-11-20
Mon-Fri 16:25 Oakland (OAK) 2 17:50 Long Beach (LGB)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-12-02 through 2025-12-11
Mon-Wed 16:25 Oakland (OAK) 2 17:50 Long Beach (LGB)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-12-15 through 2025-12-17
Wed,Thu 16:25 Oakland (OAK) 2 17:50 Long Beach (LGB)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-12-24 through 2026-01-01
Sat 16:30 Burbank (BUR) 17:40 Las Vegas Harry Reid (LAS) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-06-07 through 2025-08-02
Sun 16:40 Burbank (BUR) 17:50 Las Vegas Harry Reid (LAS) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-06-08 through 2025-08-03
Mon,Thu,Fri 16:45 Burbank (BUR) 17:55 Las Vegas Harry Reid (LAS) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 16:45 Burbank (BUR) 17:55 Las Vegas Harry Reid (LAS) 1
WN 3880 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-07-07 through 2025-08-04
Daily 17:30 Honolulu (HNL) 2 18:15 Kahului (OGG)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 0:45 Valid until 2025-06-04
Mon-Wed 17:55 Oakland (OAK) 2 19:20 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-11-25 through 2025-12-01
Mon,Tue,Fri,Sun 17:55 Oakland (OAK) 2 19:20 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-12-19 through 2026-01-04
Tue,Wed 18:20 Las Vegas Harry Reid (LAS) 1 01:15 John Glenn Columbus (CMH)
WN 3880 Non-stop Boeing 737-700 (73W) 3:55 Effective 2025-06-10 through 2025-07-30
The flight arrives 1 day after departure.
Sun 18:25 Las Vegas Harry Reid (LAS) 1 23:40 Saint Louis (STL) 2
WN 3880 Non-stop Boeing 737-700 (73W) 3:15 Effective 2025-06-08 through 2025-08-03
Mon,Thu,Fri 18:35 Las Vegas Harry Reid (LAS) 1 01:30 John Glenn Columbus (CMH)
WN 3880 Non-stop Boeing 737-700 (73W) 3:55 Effective 2025-06-05 through 2025-07-03
The flight arrives 1 day after departure.
Mon,Thu,Fri 18:35 Las Vegas Harry Reid (LAS) 1 01:30 John Glenn Columbus (CMH)
WN 3880 Non-stop Boeing 737-700 (73W) 3:55 Effective 2025-07-07 through 2025-08-04
The flight arrives 1 day after departure.
Sat 18:45 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-11-22 through 2025-11-29
Sat 18:45 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:30 Effective 2025-12-20 through 2026-01-03
Mon,Thu,Fri,Sun 18:50 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 18:50 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-11-21 through 2025-11-28
Fri,Sun 18:50 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-12-07 through 2025-12-14
Thu 18:50 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2025-12-18
Mon 18:50 Oakland (OAK) 2 20:15 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-05
Sun 19:00 Oakland (OAK) 2 20:25 Long Beach (LGB)
WN 3880 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2025-11-30
Sun 21:20 Denver (DEN) 00:35 Midway, Chicago (MDW)
WN 3880 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Effective 2025-10-05 through 2025-10-26
The flight arrives 1 day after departure.
Non-Direct Flights:
Sun 16:40 Burbank (BUR) 23:40 Saint Louis (STL) 2
WN 3880 1-stop Boeing 737-700 (73W) 5:00 Effective 2025-06-08 through 2025-08-03
Mon,Thu,Fri 16:45 Burbank (BUR) 01:30 John Glenn Columbus (CMH)
WN 3880 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-06-05 through 2025-07-03
The flight arrives 1 day after departure.
Mon,Thu,Fri 16:45 Burbank (BUR) 01:30 John Glenn Columbus (CMH)
WN 3880 1-stop Boeing 737-700 (73W) 5:45 Effective 2025-07-07 through 2025-08-04
The flight arrives 1 day after departure.
Ad flat here 1377413384 I FlightWNum Lower
Parallax here
This flight number is listed as serving the following routes:
Southwest Airlines flight WN 3880: Multiple routes
Ad mobi flat here (320x100px) 6074960173 M FlightWNum Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Southwest Airlines WN3880
14:45

16:15
Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
15:00

16:30
Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Valid until 2025-06-04
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 0:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3880
Effective 2025-11-25 through 2025-12-01
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-06-10 through 2025-07-30
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3880
Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 3:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3880
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3880
Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-12-20 through 2026-01-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN3880
Effective 2025-10-05 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Non-Direct Flights:

Southwest Airlines WN3880
Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 5:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3880
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:45, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3880
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 5:45, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
Ad mobi box here (300x250px) 8888825773 M FlightWNum Bottom Box
Parallax here
This flight number is listed as serving the following routes:
  • Burbank (BUR) - John Glenn Columbus (CMH)
  • Burbank (BUR) - Las Vegas Harry Reid (LAS)
  • Burbank (BUR) - Saint Louis (STL)
  • Denver (DEN) - Midway, Chicago (MDW)
  • Honolulu (HNL) - Kahului (OGG)
  • Las Vegas Harry Reid (LAS) - John Glenn Columbus (CMH)
  • Las Vegas Harry Reid (LAS) - Saint Louis (STL)
  • Oakland (OAK) - Long Beach (LGB)
  • Oakland (OAK) - San Diego (SAN)