Southwest Airlines flight WN 2931: Multiple routes

Ad box here 1220564027 I FlightWNum Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sun 05:15 Kansas City (MCI) 06:45 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2025-11-30
Mon,Thu,Fri,Sun 05:40 Kansas City (MCI) 07:05 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-11-02 through 2025-11-16
Mon,Fri,Sun 05:40 Kansas City (MCI) 07:05 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-11-21 through 2025-11-28
Fri,Sun 05:40 Kansas City (MCI) 07:05 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Effective 2025-12-07 through 2025-12-14
Thu 05:40 Kansas City (MCI) 07:05 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2025-12-18
Mon 05:40 Kansas City (MCI) 07:05 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:25 Operates only on 2026-01-05
Sat 05:45 Kansas City (MCI) 07:10 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-11-08 through 2025-11-15
Sat 05:45 Kansas City (MCI) 07:10 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-12-06 through 2025-12-13
Sat 06:50 Miami (MIA) 07:55 Orlando (MCO)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:05 Effective 2025-10-04 through 2025-11-01
Tue,Wed 06:55 Miami (MIA) 08:05 Orlando (MCO)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:10 Effective 2025-10-07 through 2025-10-29
Sun 07:00 Miami (MIA) 08:10 Orlando (MCO)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:10 Effective 2025-10-05 through 2025-10-26
Mon,Thu,Fri 07:05 Miami (MIA) 08:15 Orlando (MCO)
WN 2931 Non-stop Boeing 737-700 (Scimitar Winglets) 1:10 Effective 2025-10-02 through 2025-10-31
Sun 09:20 Long Beach (LGB) 10:45 Sacramento (SMF) B
WN 2931 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-08-10 through 2025-08-24
Sun 09:20 Long Beach (LGB) 10:45 Sacramento (SMF) B
WN 2931 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-09-07 through 2025-09-28
Sun 10:00 Fresno (FAT) 11:20 Las Vegas Harry Reid (LAS) 1
WN 2931 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-08 through 2025-08-03
Tue,Wed 10:00 Long Beach (LGB) 11:25 Sacramento (SMF) B
WN 2931 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-08-05 through 2025-10-01
Mon,Thu,Fri 10:15 Long Beach (LGB) 11:40 Sacramento (SMF) B
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-08-07 through 2025-09-29
Sun 14:25 Houston Hobby (HOU) 16:10 Denver (DEN)
WN 2931 Non-stop Boeing 737-800 (73H) 2:45 Operates only on 2025-05-25
Fri 15:20 Fresno (FAT) 16:50 Las Vegas Harry Reid (LAS) 1
WN 2931 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2025-07-04
Tue,Wed 15:30 Kansas City (MCI) 16:55 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-11-04 through 2025-11-12
Mon-Thu 15:30 Kansas City (MCI) 16:55 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-11-17 through 2025-11-20
Mon-Fri 15:30 Kansas City (MCI) 16:55 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-12-02 through 2025-12-11
Mon-Wed 15:30 Kansas City (MCI) 16:55 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-12-15 through 2025-12-17
Wed,Thu 15:30 Kansas City (MCI) 16:55 Midway, Chicago (MDW)
WN 2931 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-12-24 through 2026-01-01
Sat 15:50 Fresno (FAT) 17:10 Las Vegas Harry Reid (LAS) 1
WN 2931 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-06-07 through 2025-08-02
Mon,Thu,Fri 18:40 Fresno (FAT) 19:55 Las Vegas Harry Reid (LAS) 1
WN 2931 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-06-05 through 2025-07-03
Mon,Thu,Fri 18:40 Fresno (FAT) 19:55 Las Vegas Harry Reid (LAS) 1
WN 2931 Non-stop Boeing 737-700 (73W) 1:15 Effective 2025-07-07 through 2025-08-04
Sat 20:45 Houston Hobby (HOU) 22:35 Denver (DEN)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Valid until 2025-05-31
Mon,Thu,Fri 20:45 Las Vegas Harry Reid (LAS) 1 01:30 Austin (AUS)
WN 2931 Non-stop Boeing 737-700 (73W) 2:45 Effective 2025-06-05 through 2025-07-03
The flight arrives 1 day after departure.
Mon,Thu,Fri 20:45 Las Vegas Harry Reid (LAS) 1 01:30 Austin (AUS)
WN 2931 Non-stop Boeing 737-700 (73W) 2:45 Effective 2025-07-07 through 2025-08-04
The flight arrives 1 day after departure.
Sun 21:35 Houston Hobby (HOU) 23:10 Denver (DEN)
WN 2931 Non-stop Boeing 737-700 (73W) 2:35 Valid until 2025-05-18
Sun 21:35 Houston Hobby (HOU) 23:10 Denver (DEN)
WN 2931 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-06-01
Mon,Thu,Fri 21:45 Houston Hobby (HOU) 23:25 Denver (DEN)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Valid until 2025-06-02
Tue,Wed 21:50 Houston Hobby (HOU) 23:30 Denver (DEN)
WN 2931 Non-stop Boeing 737-700 (73W) 2:40 Valid until 2025-06-04
Tue,Wed,Sat 22:25 Orlando (MCO) 00:05 Houston Hobby (HOU)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2025-11-22 through 2025-11-29
The flight arrives 1 day after departure.
Mon 22:25 Orlando (MCO) 00:05 Houston Hobby (HOU)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2025-12-01
The flight arrives 1 day after departure.
Mon,Tue,Fri-Sun 22:25 Orlando (MCO) 00:05 Houston Hobby (HOU)
WN 2931 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2025-12-19 through 2026-01-04
The flight arrives 1 day after departure.
Non-Direct Flights:
Mon,Thu,Fri 18:40 Fresno (FAT) 01:30 Austin (AUS)
WN 2931 1-stop Boeing 737-700 (73W) 4:50 Effective 2025-06-05 through 2025-07-03
The flight arrives 1 day after departure.
Mon,Thu,Fri 18:40 Fresno (FAT) 01:30 Austin (AUS)
WN 2931 1-stop Boeing 737-700 (73W) 4:50 Effective 2025-07-07 through 2025-08-04
The flight arrives 1 day after departure.
Ad flat here 1377413384 I FlightWNum Lower
Parallax here
This flight number is listed as serving the following routes:
Southwest Airlines flight WN 2931: Multiple routes
Ad mobi flat here (320x100px) 6074960173 M FlightWNum Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Southwest Airlines WN2931
Operates only on 2025-11-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2931
Effective 2025-11-02 through 2025-11-16
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-11-21 through 2025-11-28
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-12-07 through 2025-12-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Operates only on 2025-12-18
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Operates only on 2026-01-05
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-11-08 through 2025-11-15
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-12-06 through 2025-12-13
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-10-04 through 2025-11-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-10-07 through 2025-10-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-10-05 through 2025-10-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-10-02 through 2025-10-31
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2931
Effective 2025-08-10 through 2025-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-09-07 through 2025-09-28
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-06-08 through 2025-08-03
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-08-05 through 2025-10-01
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-08-07 through 2025-09-29
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Operates only on 2025-05-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Operates only on 2025-07-04
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-11-04 through 2025-11-12
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-11-17 through 2025-11-20
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-12-02 through 2025-12-11
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-12-15 through 2025-12-17
Mon
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-12-24 through 2026-01-01
Mon
-
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2931
Effective 2025-06-07 through 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Valid until 2025-05-31
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2931
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2931
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:45, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2931
Valid until 2025-05-18
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Operates only on 2025-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Valid until 2025-06-02
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2931
Valid until 2025-06-04
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2931
Effective 2025-11-22 through 2025-11-29
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2931
Operates only on 2025-12-01
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2931
Effective 2025-12-19 through 2026-01-04
Mon
Tue
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Non-Direct Flights:

Southwest Airlines WN2931
18:40

01:30(+1)
Effective 2025-06-05 through 2025-07-03
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:50, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2931
18:40

01:30(+1)
Effective 2025-07-07 through 2025-08-04
Mon
Tue
-
Wed
-
Thu
Fri
Sat
-
Sun
-
Duration: 4:50, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
Ad mobi box here (300x250px) 8888825773 M FlightWNum Bottom Box
Parallax here
This flight number is listed as serving the following routes:
  • Fresno (FAT) - Austin (AUS)
  • Fresno (FAT) - Las Vegas Harry Reid (LAS)
  • Houston Hobby (HOU) - Denver (DEN)
  • Kansas City (MCI) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Austin (AUS)
  • Long Beach (LGB) - Sacramento (SMF)
  • Miami (MIA) - Orlando (MCO)
  • Orlando (MCO) - Houston Hobby (HOU)