FLIGHT SCHEDULE |
---|
Direct Flights: |
Thu
16:25
Sharm el-Sheikh (SSH) 1
19:30
Sofia (SOF) 2 FB 8536 Non-stop Boeing 737-300 (733) 3:05 Effective 2025-05-08 through 2025-05-15 This is a Charter flight. |
Thu
21:30
Sharm el-Sheikh (SSH) 1
00:35
Sofia (SOF) 2 FB 8536 Non-stop Boeing 737-300 (733) 3:05 Operates only on 2025-05-22 The flight arrives 1 day after departure. This is a Charter flight. |